Samtec Specialized Cables

Results: 3,278
Select Image Part # Mfr. Description Datasheet Availability Pricing (KRW) Filter the results in the table by unit price based on your quantity. Qty. RoHS ECAD Model Product Type Connector End A Connector End A Pin Count Connector End B Connector End B Pin Count Cable Length Gender Wire Gauge - AWG Voltage Rating Jacket Color Current Rating IP Rating Series Packaging
Samtec ARC6-08-07.9-LU-LU-3R-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩77,069.1
₩64,217.2
₩59,271
₩55,043.4
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.0-LU-LD-2-3
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩77,125.5
₩64,259.5
₩59,313.2
₩55,085.6
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.1-LU-LD-2-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩70,474.1
₩69,431.3
₩68,585.8
₩67,853
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.1-LU-LU-3-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩70,474.1
₩69,459.5
₩68,599.9
₩67,881.2
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.2-LU-LD-2-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩77,449.6
₩64,527.3
₩59,566.9
₩55,311.1
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.2-LU-LU-3-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩70,572.7
₩69,995
₩69,529.9
₩69,121.3
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.4-LU-LU-3-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩70,727.7
₩70,150
₩69,684.9
₩69,276.3
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.5-LU-LD-2-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly Non-Stocked Lead-Time 4 Weeks
₩57,171.2
₩56,537.1
Min.: 1
Mult.: 1
ARC6 Bag
Samtec ARC6-08-08.6-LU-LD-2-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩70,896.9
₩70,319.1
₩69,840
₩69,431.3
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.6-LU-LD-2-3
Samtec Specialized Cables AcceleRate Slim Cable Assembly Non-Stocked Lead-Time 4 Weeks
₩57,241.7
₩57,157.2
Min.: 1
Mult.: 1
ARC6 Bag
Samtec ARC6-08-08.6-LU-LU-3-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩70,896.9
₩69,854
₩59,623.3
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.7-LU-LD-2-3
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩77,844.2
₩64,865.5
₩59,707.8
₩57,410.8
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.8-LU-LD-2-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly Non-Stocked Lead-Time 4 Weeks
₩56,663.9
Min.: 1
Mult.: 1
ARC6 Bag
Samtec ARC6-08-08.8-LU-LD-2-2
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩77,844.2
₩64,865.5
₩59,862.8
₩55,592.9
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.9-LU-LD-2-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩71,150.5
₩70,065.4
₩59,848.7
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.9-LU-LU-3-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩71,150.5
₩70,558.6
₩59,848.7
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.00-LU-LD-2-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly Non-Stocked Lead-Time 4 Weeks
₩57,861.8
₩57,847.7
Min.: 1
Mult.: 1
ARC6 Bag
Samtec ARC6-08-08.0-LU-LU-3R-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 6 Weeks
₩80,098.9
₩78,858.8
₩68,332.1
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.1-LU-LD-2R-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩80,197.6
₩78,957.5
₩78,478.3
₩78,069.7
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.1-LU-LU-3R-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩80,225.8
₩78,971.6
₩78,492.4
₩78,083.8
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.2-LU-LU-3R-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩79,845.3
₩75,800.9
₩74,250.7
₩72,926.1
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.4-LU-LU-3R-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩80,000.3
₩75,955.9
₩74,405.8
₩73,067
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-08.9-LU-LU-3R-1
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩80,803.5
₩79,549.3
₩79,084.3
₩78,675.6
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-09.0-LU-LD-2-3
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩71,235.1
₩70,276.8
₩59,933.3
Min.: 1
Mult.: 1
ARC6
Samtec ARC6-08-09.0-LU-LU-3-3
Samtec Specialized Cables AcceleRate Slim Cable Assembly, 0.635 mm Pitch Non-Stocked Lead-Time 3 Weeks
₩71,235.1
₩70,276.8
₩59,933.3
Min.: 1
Mult.: 1
ARC6